Skip to product information
Water Temperature (Temp) Sensor fits Alfano 6, 7 & Legend Long Lead Rotax X30 Kart
£43.50
Long Water Temperature (Temp) Sensor fits Alfano 6, 7 & Legend - Rotax X30 Kart
Long lead that reaches from the engine to the Alfano head unit, on the steering wheel.
1 year guarantee*
Compatible with:
- All karts that use a 10mm fine or 1/8 NPT thread sizes, including most ROTAX, KF1, KF2, KF3, KGP, ICC.
- Karts that the sensor screws into the tee piece in the radiator hose.
Installation Notes:
- The sensor has a tapered thread designed to fit in 10mm fine used as standard in karts. The thread is “self sealing” and will not screw all the way in.
- Screw the sensor into its housing finger tight. Ensure the wire is not being twisted, then tighten the sensor another 2 to 5 turns until it feels firm. Run the engine and check for a leak. If there is tighten another ½ turn.
- A little PTFE tape can also help if needed.
- DO NOT over-tighten!
*Guarantee covers the sensor ONLY. We recommend installation by a qualified person.