Skip to product information
Water Temperature (temp) Sensor fits Alfano - Long Lead Rotax X30 Kart
£42.50
Water Temperature (temp) Sensor fits Alfano - Long Lead Rotax X30 Kart
Long lead (150cm) that reaches from the engine to the Alfano head unit, on the steering wheel.
1 year guarantee*
Compatible with:
- All karts that use a 10mm fine or 1/8 NPT thread sizes, this includes most KF1, KF2, KF3, KGP, ICC.
- Karts where the sensor screws into the tee piece in the radiator hose.
Made in the UK by Kart Crazy.
Installation Notes:
- The sensor has a tapered thread designed to fit in 10mm fine used as standard in karts. The thread is “self sealing” and will not screw all the way in.
- Screw the sensor into its housing finger tight. Ensure the wire is not being twisted. Then tighten the sensor another 2 to 5 turns until it feels firm. Run the engine and check for a leak. If there is tighten another ½ turn.
- A little PTFE tape can also help if needed.
- DO NOT over-tighten!
*Guarantee covers the sensor ONLY. We recommend installation by a qualified person.