Water Temperature (Temp) Sensor MyChron 2T 4 & 5 Long Lead 7 Pin Kart Rotax X30

Water Temperature (Temp) Sensor MyChron 2T 4 & 5 Long Lead 7 Pin Kart Rotax X30

£57.00
Skip to product information
Water Temperature (Temp) Sensor MyChron 2T 4 & 5 Long Lead 7 Pin Kart Rotax X30
1/2

Water Temperature (Temp) Sensor MyChron 2T 4 & 5 Long Lead 7 Pin Kart Rotax X30

£57.00

Patch lead compatible with the 2T MyChrons

7 pin connector

Made in the UK by Kart Crazy
Installation Notes:

  • The sensor has a tapered thread designed to fit in 10mm fine used as standard in karts. The thread is “self sealing” and will not screw all the way in.
  • Screw the sensor into its housing finger tight. Ensure the wire is not being twisted, then tighten the sensor another 2 to 5 turns until it feels firm. Run the engine and check for a leak. If there is tighten another ½ turn.
  • A little PTFE tape can also help if needed.
  • DO NOT over-tighten!

*Guarantee covers the sensor ONLY. We recommend installation by a qualified person.

You may also like