Skip to product information
Water Temperature (Temp) Sensor MyChron 2T 4 & 5 Long Lead 7 Pin Kart Rotax X30
£57.00
Patch lead compatible with the 2T MyChrons
7 pin connector
Made in the UK by Kart Crazy
Installation Notes:
- The sensor has a tapered thread designed to fit in 10mm fine used as standard in karts. The thread is “self sealing” and will not screw all the way in.
- Screw the sensor into its housing finger tight. Ensure the wire is not being twisted, then tighten the sensor another 2 to 5 turns until it feels firm. Run the engine and check for a leak. If there is tighten another ½ turn.
- A little PTFE tape can also help if needed.
- DO NOT over-tighten!
*Guarantee covers the sensor ONLY. We recommend installation by a qualified person.